Equipment Dry Rates

  1. (2 Nos) Fiat Allis FD20 Dozer, 95$US per hr (min 20hrs), 800$US per day contract rate (9hrs), additional charged hourly + overtime.
  2. CAT 16G Motor Grader 95$US per hr (min 4 hrs), 800$US per day contract rate (9hrs), additional charged hourly + overtime
  3. Hyundai 29 ton Excavator (bucket/breaker), 95$US per hour (min 5 hrs), 800$US per day contract rate 9 hrs, additional charged hourly + overtime.
  4. Caterpillar 966D/Michegan 125C, Wheel Loader 90$US per hour, 750$US per day contract rate (9 hrs), additional charged hourly + overtime.
  5. Caterpillar 955K, Track loader with ripper 84$US per hr (min charge 4 hrs), 700$US per day contract rate (9 hrs - additional charged hourly + overtime.
  6. Fiat Allis 65 Grader, 65$ ph (min 3hrs), 550$US per day contract rate (9hrs)
  7. ASV RC100, 100hp Multi Terrain Loader 65$ ph (min 4 hrs), 550$US per day (9 hrs), available with extensive range of attachments for bush cutting, levelling, loading, forks, backhoe etc.
  8. Case Vibromax Vibrating Smooth Drum Roller 12 ton, 65$US per hour (min charge 3 hrs)/550$US per day contract rate (9hrs)-additional charged as hourly +operator’s overtime .
  9. Delco BackHoe XP-95 58$per hr Dry Rate(Min 4hrs).
  10. FC1A 1 tonne Dumper, 60$ per day
  11. 8x4 Tipper, 35$US per hr, min 4hrs
  12. 6x4 Beiben P/Mover + 2 axle tipping semi, 15$US per km, min 100$ per trip
  13. 6x4 M/Benz 2624 P/Mover + 3 axle 40’ flat semi, 12$ p/km, min 150$ per trip
  14. 6x4 Prime Mover + 3 axle 30 ton Low loader, 25US$ per km, min350$ per trip
  15. 6x4 Mack P/Mover + 40 ton Low loader & 25 ton/m auxiliary crane, 35$ p/km
  16. For Cat 613 Scraper, Henley 11ton Forklift, Demag DF9 Paver, Corsina 20ton pneumatic roller, Cimesa 5 ton Vibrating Roller, Case 580SK Loader Backhoe, Water Bowser, Pedestrian Roller, Generators, Mobile Compressor 600cfm, Hydroblaster, Light Tower, 400 amp, Mobile Welder, Plate Compactor, Poker Vibrator etc please contact us
  17. Bush clearing,Top Soil Removal/Excavation, Leveling and Backfill/Compaction etc done on per cubic meter/square meter rates according to site conditions, distance, quantity; contact us to arrange a site visit so we can give you a competitive quote.